        Construction and installation  
        Zhuhai Jianan Group Co., Ltd. was established in 1987. In 1996, it was promoted to a state-level construction enterprise. It is the only municipal state-owned grade A construction general contracting enterprise in Zhuhai City.

        The company has a number of contracting qualifications, including grade A general contracting of building construction work, grade A general contracting of municipal public construction work, grade A professional contracting of mechanical and electrical equipment installation, grade A professional contracting of building decoration engineering, grade B professional contracting of building curtain wall engineering, grade B professional contracting of steel structure engineering, grade C professional contracting of foundation and foundation engineering, grade C qualification for real estate development and grade B qualification for architectural decoration design.
        Project Name: Vocational Rehabilitation Building Expansion Project, Zhuhai Special Education School
        Project location: 68 Cuifu Road, Qianshan
        Development unit: Zhuhai Municipal Government Investment Project Construction Supervision and Management Center
        Construction unit: Zhuhai Jianan Group Co., Ltd.
        Supervising unit: Guangdong Construction Engineering Supervision Co., Ltd.
        Designing Unit: Architectural Design and Research Institute, Xi'an University of Architecture and Technology
        Surveying Unit: Engineering Survey Institute of Zhuhai City, Guangdong Province

        The Zhuhai City Special Education School's vocational rehabilitation building expansion project, located in the original Zhuhai Special Education School (68 Cuifu Road), is invested by the proxy development unit Zhuhai Municipal Government Investment Project Construction Supervision and Management Center. The project consists of three individual buildings, including the rehabilitation building, cultural and sports complex building, and transformer/power distribution room & generator room. Rehabilitation building area is 10,446.22 m with a total of 6 floors; cultural and sports complex building area is 3,498.57 mwith a total of 4 floors; the transformer/power distribution room & generator room construction area is 198.44 m2 with one floor. Framework Structure. The construction period is 300 days.

        The project started on August 31, 2016 and completed inspection acceptance on September 13, 2017. The construction includes earth excavation and backfill, foundation pit and foundation, main structure, indoor and outdoor decoration works, water supply and drainage works, fire protection engineering, lightning protection engineering, outdoor roads and greening projects.